Stage 3: Corvette Engine WorksRebored block, reground crank shaft clean and ready for assembly. Crank installed with new main bearings. New pistons and rings installed. Oil pump fitted and primed, sump fitted. Head gaskets fitted on valves. Right & left hand cylinder heads fitted with lifters, push rods and rocker shafts. Manifold seals and gaskets installed ready for fitments. Dynamo fitted with water pump and pulleys. link belt used to establish size as pulleys not original. Distributor cap and leads fitted and timed. Back to Project | Stage 4